Wednesday, 29 October 2014

30/10/14

Looked through everyone's animations and gave pointers (jared and raj looked at mine) so far we might be able to get everything done on time.

but still have issues with one person. who ive notice always off with another person and have been complaining about me (and they dis my spelling which i know that i have a problem with, for years my parents paid people to try and help me to spell better) i also didnt like how he said that we have time, as we still have 3 weeks. truth to be told its less time than that. too also get everything else that we have to do, animation needs to be last day worked on is monday 3rd. right now i dont need a big baby doing as he wishes, at the moment i have my own issues to deal with. my sister is in hospital and i havent heard how she is recovering at all today. its not easy being so far away from my family. all my family has been worried about the operation as last time it didnt go very well. this time round it took them longer than they thought as there was more to be removed. i wont go into much details about it as she doesnt like people to know the details.

ive fixed my animation and so has 2 others. one person wasn't here today so he is a little behind but not much he needs to fix. on track plus also have some of the sounds also coming together plus with the credits also starting to be created. i know that ours is very simple. but its great for the short time frame that we have to complete this project


Tuesday, 28 October 2014

29/10/14

today finished animation and got the group to playblast what they have done and give feedback on each others work. also getting jared to put them together so we can see what it kinda would look like.

after the feedback started working on the few that needed editing. been trying to make sure all group stuff is submitted that needed to and the other stuff that is needed. plus been looking at what needs to be done and working on schedule.

at the moment the only trouble ive been having most of the time is someone not following my instructions and been doing his own thing. plus been getting other members to do what he wants not what needs to be done first. i have tried to spread out the work and make it so we can finish the project in time. but with him he has been changing that. forcing my hand to get other people to do more work in our own time when we come in so the group can be up to date. sadly its only me and jared that has been doing that as dara and daniel have their own work needing to be finished (which i let them do that on their own time as they have been doing great keeping up with group work as well) so me and jared have been doing all the extra work. (most of the time jared is noted of doing it as i had to work on group submission stuff). i think if we had better communication and that they listen to me (which most of them do) then this will be going much better and we might be even more ahead.

been looking up some background sounds that we could use. found some that might work great

Monday, 27 October 2014

28/10/14

Today group started blocking and animating. Since there are short and lots of shots, most were done very quickly. i finished animating my owns but still got to get group feedback to know what i still need to fix.



Thursday, 23 October 2014

24/10/14

today still trying to catch up will all the work and trying to complete and submit it. thankfully jared also come in so that was on tuesday all of us will be ready to animate. hes doing the layout which was someone else job on friday but i dont know what happened but thats not done at all. and we should a few other issues with lay out like the set being under the grid (which its not meant to) so today is just trying to fix and complete things.

23/10/14

As group leader ive been trying to sort our group stuff and making sure everything is upto date. sadly someone or somehow our stuff on the student server was deleted and i had our shared group stuff backed up but not the submission folder. so for most of the day ive been trying to gather and re do things so we have everything submitted that we needed to.

Tuesday, 21 October 2014

21/10/14 - 22/10/14

the 21st i was at home recovering, due to being sick. But i managed to force myself to come on the 22nd. today managed to finish creating the female robot and texturing her. she doesnt need a rig. just working on finishing all the modelling and texturing so that way we can get to animating next week



Sunday, 19 October 2014

20/10/14

Finished all the drawings and designing needed for the female robot. started modelling her to. almost finished just got her head then touch-ups left afterwards. also every easy texturing. so happy about that as lots of the group stuff can be finished early/on time and we can start animating soon. yay